“Better than before”: what the Build Back Better principle actually means

The phrase “better than before” has been heard in Ukraine since 2023, and it is usually read as a promise of a better repair: flatter roads, newer windows. Behind it stands a different idea, older than our war: Build Back Better is an approach to post-disaster recovery in which the main question is not “how do we put it back the way it was” but “how do we make the losses smaller next time”. Ukrainian documents have carried this principle since 2023. Cost estimates almost never do.

Where the Build Back Better principle came from

The wording comes from the Sendai Framework for Disaster Risk Reduction, adopted in 2015 under the auspices of the UN. Build Back Better in recovery, rehabilitation and reconstruction is the subject of its Priority 4 – the same one that covers disaster preparedness.

The Sendai Framework for Disaster Risk Reduction is the document countries use to plan their action on disasters: from earthquakes and floods to industrial accidents. The Framework runs from 2015 to 2030.

The Framework sets four priorities. The fourth reads: strengthening disaster preparedness for effective response and Build Back Better in recovery, rehabilitation and reconstruction.

After a disaster a country spends heavily on repairs anyway. That is the one moment when changing what made it vulnerable is cheapest.

Who Priority 4 names separately

Priority 4 also speaks about the people who usually are not asked:

  • women and persons with disabilities should be among those who visibly lead reconstruction and take decisions at the response and reconstruction stages;
  • accessibility is built into the design at the start, while it is still cheap to provide for.

What this means in practice

An underground network instead of the same overhead line. An insulated school with a shelter instead of new glass in an old frame. The right-hand column of the cost estimate is always dearer at the start, and running the site behind it is always cheaper.

The difference between a repair and recovery under the “better than before” principle shows up in specific decisions.

Restore it as it wasRestore it better than it was
Repair the same overhead power lineMove the network underground, add local generation and storage
Reglaze the school with the same glassInsulate the building, install energy-saving windows, fit out a shelter accessible to people with reduced mobility
Replace the burst section of the water mainRelay the network against the real number of residents and the real water losses
Rebuild the house on the same spot to the old planRevisit the street layout: access for machinery, a shelter nearby, barrier-free access

The difference between the columns is the difference between two budgets. The left one saves money today and comes back as another repair after the next strike. The right one takes more at the start, and it takes part of the future bills for heating, water and repairs off the hromada (Ukraine's consolidated local self-government unit).

How the principle entered Ukrainian practice

Resolution No. 382 named six settlements where comprehensive reconstruction was to begin, Tsyrkuny among them. The Prime Minister named “better than before” one of the core principles. The document is in force; the current version dates from 20 March 2025.

The government adopted this resolution on 25 April 2023. Six settlements were taken into the experimental project:

  • Borodianka
  • Moshchun
  • Posad-Pokrovske
  • Trostianets
  • Tsyrkuny
  • Yahidne

Prime Minister Denys Shmyhal then named Build Back Better one of the core principles and explained:

“they will rebuild not separate buildings and structures but everything – with a systemic approach, new planning and a full transformation of these settlements”.
The implementation period of the experimental project recorded in the version of the resolution now in force covers 2023-2025. The document carries no amendments that would extend it into 2026.

Where the principle stalls

The Transparency International review of the first year showed four gaps: improvement never became mandatory, the criterion for selecting settlements did not hold, participation by hromadas was made optional, and funding stopped in 2024. Works were completed at one site out of more than 300 planned.

The slogan was voiced in a government speech and never reached the procedure. Across the first year of the experiment the gap is visible in four places – Transparency International recorded them.

Improvement never became mandatory

The Procedure for implementing the project carries no condition of mandatory improvement. Restore a damaged site to its former condition and you have formally delivered the programme.

The selection criterion did not hold

The level of destruction was meant to be decisive. The list did not hold to it:

SettlementWhat the assessments showed
Moshchunover 70% of structures damaged or destroyed (2,000 buildings, RebuildUA data)
Borodiankaoverall level of destruction 15%

The authors of the review write about an “absence of a single approach” to selection.

The hromada was left out

Participation by local self-government in the project was made optional: lists of sites are drawn up by Oblast Military Administrations, and the procedure says nothing about how and within what deadlines a hromada submits its own proposals.

The money stopped

In 2023, out of the planned UAH 3.3 billion, just over UAH 0.5 billion was allocated, and in 2024 funding for the experiment stopped. Over the first year, out of more than 300 planned sites, works were completed at only one.

1 of 300+sites where works were completed over the first year of the experiment

These facts are no reason to drop the principle. They show where it falls apart: between the slogan and the design documentation there is no link that turns the first into the second.

What follows from this for a hromada

The principle works only when the hromada writes it into the documents itself. Five steps: improvement into the terms of reference and the cost estimate; a calculation of what the site costs to run; taking the need up to a ready project with a legal mechanism and a financial model; your own proposal into the oblast list; smaller sources of money alongside the big programme.

The Procedure for implementing the experimental project does not require improving the characteristics of a site during recovery. So the requirement is written by whoever commissions the works and prepares the documents – the hromada.

Improvement is most often lost on two pages: in the terms of reference, where nobody wrote it, and in the cost estimate, where it was cut at the approval stage. After that no contractor will add it, because they are paid for what stands in the estimate.

If improvement is not written into the design documentation and the cost estimate, it will not appear there.

Five steps that close this:

1

Write improvement into the terms of reference and the cost estimate

Energy efficiency class, accessibility, underground networks and shelters have to stand in the document the money is counted against. In an explanatory note they carry no weight.

2

Calculate what the site costs to run

Insulation and own generation pay back through the energy bills. Calculate that saving 10-15 years ahead and show the donor the figures – a dearer estimate then reads differently.

3

Take the need up to project stage

A description of the need, a legal mechanism for delivery, a financial model. Without these three parts a donor cannot see what to fund.

4

Enter the oblast lists with your own proposals

The procedure does not oblige the Oblast Military Administration to ask the hromada, so the initiative has to come from the hromada. A ready proposal with a design and a cost estimate has a chance of reaching the list; a mention at a meeting does not.

5

Do not wait for one big programme

Part of these decisions is covered by state energy support programmes, grants and partnerships. As of 16 February 2026 the state compensated private houses and townhouses up to 30% of the cost of equipment (a loan of up to UAH 480,000 for a term of up to 10 years), and condominium associations (OSBB) and housing cooperatives up to 50% for a generator and up to 70% for a solar power plant or a heat pump (a loan of up to UAH 3 million for a term of up to 3 years).

Tip: Programme terms change. Before you file an application, check the amounts and percentages with the partner bank.

What it looks like in Tsyrkuny

The oblast Recovery Service wrote the Tsyrkuny concept exactly to the principle: a village of a new format instead of a repair of the old one. The same concept shows the limit of the principle – capital works are on hold, because the village is effectively on the line of contact and no funds have been allocated.

The concept sets out underground utilities, new roads and buildings, a solar power plant, a landscape park, a recreation park by a water body and dormitories for the workers of local enterprises.

~UAH 10 billionindicative cost of the Tsyrkuny recovery concept

And the same concept shows the limit of the principle. Preparatory and design works are under way, capital works are not starting: working in the village is close to impossible. The decision on the start is taken by the Cabinet of Ministers and the Kharkiv Oblast Administration, and one more thing will be weighed – how many people come back. From the outset the Recovery Service allowed that only part of the concept would be delivered, depending on funds.

What it looks like close up is in the piece on the comprehensive recovery of Tsyrkuny.

What the hromada is doing while the big reconstruction waits

  • land release across the territory;
  • trucking in drinking water;
  • installing generators;
  • a modular outpatient clinic;
  • a hromada development plan to 2030.

Who can close the gap between the slogan and the project

A new resolution will not close this gap: someone has to take a hromada's need up to a ready project with a legal mechanism and a financial model. That is work on the ground, and a single organisation does not carry it – it needs a team drawn from several backgrounds.

Between the slogan and the design documentation stands work nobody is obliged to do: collect the hromada's need, check what can lawfully close it, count the money and find who will give it. The resolution does not do this work.

It is within reach for a team that holds:

  • civil society organisations;
  • local self-government bodies;
  • business;
  • researchers;
  • veterans with management experience.

We are initiating such work together with partners. How it is built is in the piece on the collaboration platform for hromada recovery.

This material is for information only and does not replace legal advice. Resolution of the Cabinet of Ministers of Ukraine No. 382 is cited in the current version of 20 March 2025: before taking decisions, check the version in force at zakon.rada.gov.ua.

FAQ

What does the Build Back Better principle mean in plain words?
It is an approach to post-disaster recovery: the money that goes into repairs anyway is used to remove the cause of the vulnerability. There is one yardstick here – how much smaller the losses will be after the next strike.
Where is the “better than before” principle set out at international level?
In the Sendai Framework for Disaster Risk Reduction 2015-2030, adopted in 2015 under the auspices of the UN. Build Back Better is named in Priority 4 – the one on disaster preparedness and on recovery, rehabilitation and reconstruction.
Which settlements were taken into the Ukrainian experimental project?
The government designated six settlements by Resolution of the Cabinet of Ministers of Ukraine No. 382 of 25 April 2023: Borodianka, Moshchun, Posad-Pokrovske, Trostianets, Tsyrkuny and Yahidne. The resolution is in force; the current version dates from 20 March 2025.
Does the programme oblige anyone to improve sites during recovery?
No. Transparency International recorded that the Procedure for implementing the project does not require improving the technical or quality characteristics of damaged sites. Repair it as it was and you formally stay within the programme.
How many sites were restored in the first year of the experiment?
Out of more than 300 planned sites, works were completed at only one, and that one was not a priority need. In 2023, out of the planned UAH 3.3 billion, just over UAH 0.5 billion was allocated, and in 2024 funding stopped.
Is the experimental project running in 2026?
Resolution No. 382 is in force; the current version dates from 20 March 2025. But the implementation period recorded in it is 2023-2025, and the document carries no amendments that would extend it into 2026.
What should a hromada do for the principle to work in practice?
Write improvement into the terms of reference and the cost estimate. Calculate what the site will cost to run. Take the need up to a ready project: legal mechanism, cost estimate, source of funding. Enter the oblast list itself with a ready proposal.
Why have capital works in Tsyrkuny not started?
The village is effectively on the line of contact, and working there is close to impossible. The concept is ready, its indicative cost is around UAH 10 billion, but no money has been allocated for it. The start depends on the government and the Kharkiv Oblast Administration, and also on how many people return to the village.
Why is the criterion for selecting settlements considered not to have held?
Because destruction across the selected settlements differs by a multiple: Moshchun lost over 70% of its structures, Borodianka 15%. Transparency International calls this an absence of a single approach to selection.
Can hromadas submit sites for the recovery lists themselves?
Formally they can, but the procedure does not guarantee it: lists of sites are drawn up by Oblast Military Administrations, and it sets no deadlines and no form for a hromada's proposals. So the only thing that works is a ready proposal the hromada brings itself.
Why is recovery “better than before” dearer than an ordinary repair?
Underground networks, insulation, shelters and barrier-free access raise the cost estimate at the start. The return comes later: smaller losses after the next strike, smaller heating bills, fewer repairs. When an estimate is cut in a hurry, these lines go first.

The short version

“Better than before” is not a promise of a better repair but an approach out of the Sendai Framework: build risk reduction in during recovery, so that losses are smaller next time. It entered Ukrainian practice through the experimental project under Resolution No. 382.

The weak spot shows in the Transparency International analysis: improvement never became a mandatory condition of the procedure. So the principle works only where the hromada writes it into the terms of reference and the cost estimate itself.

If your hromada is preparing decisions and looking for partners, write to us: [email protected].